TSX-V: LGOTCQB: LGCXFFSE: Y2FGold futuresSilver futuresYahoo Finance · May be delayed · Futures in US$/oz
Lahontan Gold Corp.
The historic Santa Fe open pits and Nevada mountains at sunset

Flagship project · Nevada, USA

Santa FeGold Mine

A past-producing mine advancing toward a new generation of production

Explore the project
Resource2.385 Moz AuEq
StageUpdated PEA under way
TargetConstruction in 2027

Project overview

A mine with a head start

Santa Fe is a past-producing open pit, heap leach gold and silver mine in Nevada's Walker Lane—an established mining jurisdiction with existing infrastructure and a clear development pathway.

The mine produced 359,202 ounces of gold and 702,067 ounces of silver between 1988 and 1995. Lahontan is now advancing a phased restart, led by shallow oxide material and supported by a larger sulfide resource.

28.3km² property

A consolidated land position in Mineral County, Nevada

398owned claims

Plus 45 additional claims held under option

1,275drill holes

136,515 metres of historical and modern drilling

4historic pits

Santa Fe, Slab, Calvada and York were previously mined by open pit

Updated pit-constrained MRE

2.385 Moz AuEq

+22%  |  +435 koz AuEq

The August 2026 estimate was prepared by RESPEC, effective 13 August 2026, using US$3,200/oz gold and US$40.00/oz silver.

Indicated1.195 Moz

0.78 g/t AuEq

Inferred1.190 Moz

0.61 g/t AuEq

GrowthBeyond the pits

Mineralisation extends beyond the conceptual pit shells in multiple areas

View Mineral Resource Estimate detail
Santa Fe Mine mineral resource estimate, effective 13 August 2026
DepositCategoryTonnes (Mt)Au (g/t)Ag (g/t)AuEq (g/t)AuEq (koz)
Santa Fe Deposit
OxideIndicated15.900.474.150.59301
OxideInferred13.180.322.740.41172
SulfideIndicated15.251.131.661.41692
SulfideInferred28.420.680.560.86782
Slab · Calvada · York
OxideIndicated12.090.261.190.33128
OxideInferred8.340.281.480.3696
Project total — Indicated47.530.725.550.781,195
Project total — Inferred60.610.592.400.611,190

AuEq is inclusive of recovery. Cut-off grades are 0.10 g/t AuEq for oxide and transitional material and 0.30 g/t AuEq for sulfide material. Project totals include material not itemised above. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Rounding may produce apparent discrepancies.

The restart case

Not a discovery,
A restart

Much of the work that defines an early-stage discovery has already happened at Santa Fe. The resource, historic workings, metallurgical history and access provide a practical foundation for the next development phase.

01

Known ground

More than 136 kilometres of drilling feeds the current block model, with just over half of contained ounces in the Indicated category

02

Existing footprint

Three historic open pits and four heap leach pads remain on site, alongside established access and mine infrastructure

03

Permitting active

Nevada state mine permitting is under way for the Phase One oxide plan, with a federal Mine Plan of Operations to follow.

Aerial view of the historic Santa Fe open pits
Historic open pits at the Santa Fe Mine

Development strategy

A phased route
back to production

Phase One

Oxide

Shallow oxide material processed by conventional cyanide heap leach—the same approach used historically at Santa Fe. This plan is the basis of current state-level permitting.

Cut-off grade
0.10 g/t AuEq
Gold recovery
60%–79%
Phase Two

Sulfide

Higher-grade sulfide material below the oxide cap, being assessed in the updated PEA. Test work includes a low-cost oxidising pre-leach ahead of cyanide leaching.

Cut-off grade
0.30 g/t AuEq
Recovery assumption
68%

Path to production

The work
in front of us

Three milestones are complete and two are under way, with construction targeted for 2027.

  1. Dec 2024Maiden Preliminary Economic Assessment
  2. 2025–2026Resource expansion drilling
  3. 17 Aug 2026Mineral Resource Estimate announcement
  4. In progressUpdated PEA and Nevada state permitting
  5. NextFederal Mine Plan of Operations
  6. 2027 targetStart of construction

Stay onthe list

News releases, drill results and permitting milestones, sent as they are filed.